Stage 2 – Phase A

  • Full depth reconstruction and widening to begin along the east side of U.S. 1 for construction of NB lanes.
  • Construction of U.S. 1 NB on/off ramps to take place for connecting to Street Road and the PA Turnpike Toll Plaza.
  • Full depth reconstruction and widening to be performed along the south side of Street Road for construction of EB lanes.
  • Median pier construction to begin for U.S. 1 over Street Road and U.S. 1 over the PA Turnpike.
  • A portion of Neshaminy Blvd. to be realigned and reconstructed in the area of the PA Turnpike Interchange.